Friday, October 16, 2009


Last night we got the first two sections of the wall up. After arguing about how to make 16 inches on center for about 45 minutes, we figured it out and Kel went up in the attic to cut the holes in the drywall. After much hassle and dust, we put up the first section of wall, that's the part you see with the studs going all the way to the celing. The second section was much easier as it only had 1 stud going up, the rest was just an 8 foot wall.This picture is what will be the view from outside of the arena. The grid that the barriers hang on will be attached to the ledge you see in the lower right corner of the picture.

No comments: